POSCO entrusts Paul Wurth with an important Coke Oven Project in Korea

by David Fleschen

Paul Wurth, a member of SMS group, is proud to announce the signing of
an important contract with the South-Korean steelmaking group POSCO for the new Coke Oven plant #6
at Pohang steelworks. This order confirms the customer's trust in Paul Wurth’s cokemaking technology,
after two successful projects have already been completed in the past on behalf of PT. Krakatau POSCO in
Indonesia and for their joint venture Companhia Siderúrgica de Pecèm in Brazil.


The contract was officially signed on 23 October 2020 and includes engineering, the supply of refractories
and key equipment as well as supervision services to erection and commissioning for two new Coke Oven
Batteries and a complete new Coke Oven Gas treatment plant.


Equipped with an under-jet heating system, the top-charged batteries will feature 48 ovens each with an
oven chamber dimension of 7.6m height and 20m length. The batteries are designed to reach a total
annual production of 1.5 million tons of coke, while the Coke Oven Gas treatment and by-products plant
is designed to treat a coke oven gas flow of 100.000 Nm3/h.


A particular focus is given to the environmental aspect thanks to in-house developed products such as
Paul Wurth’s SOPRECO® system (Single Oven PREssure Control) for emission control and COKEXpert™
level-2 automation system for coke oven plants. All these features will enable the customer to meet the
highest standards in terms of coke productivity and quality, emission control, energy consumption, user
friendliness and plant safety.


The start-up of the new Coke Oven Plant is expected in 2023.

Source: Paul Wurth, Photo: Fotolia

Go back